Presto Geosystems Menu
Google Translate

Copt Hewick Hall Service Road

— Ripon, North Yorkshire, UK

Project Background Copt Hewick Hall is a privately owned Grade II listed building near Ripon, North Yorkshire, England. As part… Continue Reading >

City of Opa-Locka

— Opa-Locka, Florida

Erosion of a stormwater canal caused by flooding and poor soils precipitates an erosion prevention and stormwater mitigation plan. Information… Continue Reading >

Legion Park

— Blair County, PA

The Problem In the Fall of 2004, Legion Park representatives approached the Blair County Conservation District with a problem.  The… Continue Reading >

CSX Intermodal Terminal

— Charleston, South Carolina

PROJECT OVERVIEW: The CSX Charleston Intermodal terminal aggregate surface lot required base reinforcement due to poor subgrade conditions. The two… Continue Reading >

Bucyrus Road Base Stabilization

— Bucyrus, Ohio

PROJECT BACKGROUND Ohio DOT (ODOT) needed to establish a road base in an area that had poorly marked and shallow… Continue Reading >

Duke Energy PX Line

— Callaway at Port St Joe, Florida

Rebuilding Roads, Replacing Transmission Lines Damaged During Hurricane Michael in Florida’s Panhandle. Project Background: Hurricane Michael caused extensive damage to… Continue Reading >

Canadian Oil Company

— Alberta, Canada

The Canadian oil producer in Lloydminister, Alberta, employed the GEOWEB® system on its access roads and drilling pads to reduce… Continue Reading >

Legends Field

— Tampa, FL

Repair Stormwater Detention Ponds of Severe Erosion Tampa’s Legends Field, the spring training facility of the New York Yankees, was… Continue Reading >

A.G. Simpson Inc

— Ontario, Canada

The Flexible Solution How can costly form work, reinforcing steel, and expansion joints be eliminated when lining channels with concrete?… Continue Reading >