Monthly Archives: August 2022

Are material shortages delaying your road construction projects? Here is how to stay on schedule and within budget.

Written by: Bryan Wedin, P.E., Chief Design Engineer Road construction is booming, and this trend is expected to remain strong due to high demand and the Infrastructure Investment and Jobs Act (IIJA), which includes investments across many sectors, including public infrastructure. Along with this boom, the road construction industry has been dealing with inflation-related cost increases and limited availability of construction materials. The industry has been impacted by supply-chain interruptions and shortages for many roadway materials including lime, cement, and even aggregate. These materials are typically used for roadway base construction, which means road construction projects that use these materials may be subject to delays. Due to these shortages and delays, on-site material or sand-filled GEOWEB® geocells can provide a cost-effective, readily available substitute for base materials–especially where native subgrade conditions consist of weak or soft soils. GEOWEB® Geocells for Roadway Base Stabilization The GEOWEB geocells have been used for load support and foundation applications worldwide for more than 40 years. Developed in collaboration with the U.S. Army Corps of Engineers (USACE) in the late 1970s, Presto co-invented the technology now known as geocells or a cellular confinement system (CCS). The early applications of geocells consisted primarily of stabilized, expedient… Read more »