Posts Tagged: Railroad

Advancing Rail Resilience: How Geosynthetics Help Achieve CRISI Objectives for Robust and Stable Infrastructure

Discover the Latest CRISI Rail Infrastructure Funding Opportunities: Apply Before the May 2024 Deadline   The U.S. Department of Transportation is bolstering rail infrastructure advancements through the Consolidated Rail Infrastructure and Safety Improvements (CRISI) program. With a recent allocation of $2.47 billion, the CRISI program is set to significantly impact rail safety, efficiency, sustainability, and reliability across the United States. This funding initiative is designed to support a variety of projects that are pivotal to enhancing the nation’s passenger and freight rail systems. It represents a call to action for rail industry professionals, including engineers, planners, and project managers, to leverage this opportunity to advance their rail infrastructure projects. The deadline for application submissions is 11:59 p.m. ET, May 28, 2024. Professionals in the rail sector are urged to prepare their proposals that align with CRISI’s mission to improve the rail infrastructure’s overall landscape. For a comprehensive overview of the application process and to assess project eligibility, stakeholders are encouraged to review the Fiscal Years 2023-2024 Notice of Funding Opportunity (NOFO) available through the CRISI program. This funding presents a pivotal chance for those involved in rail infrastructure to gain the support and resources needed to propel their projects forward…. Read more »

Quick Repair of Track Subgrade & Railroad Right-of-Way

GEOWEB® Geocells — Quick Fix, Long Term Protection Be prepared to repair washouts and track issues quickly and economically with one solution. The GEOWEB® 3D Soil Stabilization System is a proven 40-year solution, delivering emergency repair for track and railroad right-of-way embankments, bridges and channels. Stock readily available allows for fast deployment by local railroad crews. Contact us for more information about our GEOWEB Emergency Repair Kit Stocking Program. Wash Out Repair & Armoring: Right-of-Way Embankments | Earthen Berms | Bridge Protection | Drainage Channels Variable Infill Options: Soil/Vegetation | Aggregate | Concrete Economical Solution: Less Down Time: GEOWEB material is quickly installed to repair any size emergency and minimize track disruptions. Installation Benefit: Railroads can install the GEOWEB material with their own crews. Reduce Rock Size: Rock confined in the GEOWEB structure replaces expensive rip-rap, reducing aggregate size up to 10 times. Fast Deployment: Strong, yet light-weight GEOWEB sections are easy to transport and quick to deploy, even in difficult site access areas. Most repairs do not require large construction equipment.   Construction & Repair Versatility The GEOWEB Soil Stabilization System has been successfully employed for railroad construction and repair for over 40 years. GEOWEB sections are packaged in collapsed, easy-to-handle… Read more »

Railroad ballast performance improvement using GEOWEB® Geocells

Each year railroads must allocate a significant portion of their capital and maintenance budget toward the creation and upkeep of high-quality ballast layers. Enduring, well-designed ballast is quite literally the foundation on which a successful rail line operates. With ballooning rail traffic carrying heavier loads than ever, GEOWEB cellular confinement (geocell) effectively takes the pressure off critical ballast systems. Oregon State University (OSU) recently performed state-of-the-art, three-dimensional dynamic Finite Element modeling to analyze the reinforcing benefit of GEOWEB geocells in railway applications. Completed in cooperation with the University of Kansas (KU), who simultaneously performed a testing program of Geocell-reinforced ballast placed over weak subgrade. The digital modeling results were reinforced by the laboratory tests and showed a significant decrease in settlement of the railway ballast when GEOWEB confinement was used. Using the GEOWEB system not only decreased settlement but also reduced pressure on point-to-point aggregate load transfer contact. This resulted in less damage to ballast aggregate particles leading to less progressive deformation and longer maintenance frequencies of the entire ballast embankment. In short, more cycles mean less track down-time for maintenance. The research results were clear. The benefits of applying GEOWEB Geocell confinement for reinforcement of real ballast over weak… Read more »